放置了半年的焦化發電機組需要做哪些檢測呢?實際上不算很難,一般的要做以下幾點檢查:
What tests should be done for the coking generator set that has been placed for half a year? In fact, it is not very difficult. Generally, the following checks are required:
1、檢查機組的啟動成功率
1. Check the startup success rate of the unit
試驗方法:試驗應在符合產品技術條件規定的準備啟動狀態下,每給一個啟動指令,啟動成功后突加功率為1.0的50% 的額定負載運行5min,再停機。試驗100次。啟動成功率應大于99%。否則,則認為此項不合格。
Test method: the test shall be carried out in the ready to start state in accordance with the technical conditions of the product. After each start command is given, the test shall be conducted with 50% of the rated load of 1.0 for 5min and then shut down. 100 tests. The startup success rate shall be greater than 99%. Otherwise, it is considered as unqualified.
2、檢查機組平均故障間隔期
2. Check the mean time between failures of the unit
檢查方法:機組帶cosФ=0.8的額定負載,連續或累計運行1000h以上,焦化機、發電機均不應出現故障,控制電路的 元件不應出現二次以上故障,否則,則認為此項不合格。此項指標允許在實際運行中進行考核。
Inspection method: unit with cos Ф= 0.8 rated load, continuous or cumulative operation for more than 1000h, the coking machine and generator shall not have fault, and the elements of the control circuit shall not have more than two faults, otherwise, this item is considered unqualified. This indicator can be evaluated in actual operation.
3、檢查機組帶可控硅負載的運行情況
3. Check the operation of the unit with thyristor load
試驗方法:機組帶cosФ≥0.5的三相可控硅整流器負載,在機組額定容量的10%~50%范圍內任一點上均應能穩定工作 。如果產生低頻振蕩,應實行調整,使之能穩定工作,否則認為此項不合格。
Test method: unit with cos Ф The load of three-phase thyristor rectifier ≥ 0.5 shall be able to work stably at any point within the range of 10% ~ 50% of the rated capacity of the unit. If low-frequency oscillation occurs, it shall be adjusted to make it work stably. Otherwise, it is considered unqualified.
焦化發電機組
4、檢查自動化機組的聯動試
4. Check the linkage test of the automatic unit
檢查方法:兩臺機組應互為主備用,任選一臺作主用,人為切斷市電,主用機組自動啟動成功后供電。制造一個故障 ,使主用機組自動停機備用機組則應自動成功后供電。使市電恢復后,備用機組應級自動停機。如不合格,找出原因,排 除故障。兩臺機組分別為主用,復試三次,如仍有一次不合格,則認為此項不合格。
Inspection method: two units shall be used as main and standby for each other, and one unit shall be selected as the main one. The mains power shall be cut off manually, and the power supply shall be supplied after the main unit is automatically started successfully. If a fault is caused, the main unit will automatically shut down, and the standby unit will automatically supply power after success. After the mains power is restored, the standby unit shall stop automatically. If unqualified, find out the reason and eliminate the fault. The two units are mainly used and retested for three times. If one is still unqualified, it is considered as unqualified.
5、檢查自動化焦化發電機組自動啟動功能
5. Check the automatic startup function of the automatic coking generator set
試驗方法:接通啟動電源,將機組工作方式選擇開關搬向自動,送入啟動指令,并且人為使機組啟動不成功,機組應 自動啟動三次。
Test method: connect the startup power supply, move the unit working mode selection switch to automatic, and send the startup command. If the unit fails to be started manually, the unit shall be started automatically for three times.
試驗三次,只要有一次不合格,復試次數加倍,若仍有一次不合格,則認為此項不合格。
If one of the three tests is unqualified, the number of retests shall be doubled. If there is still one unqualified, it is considered to be unqualified.
6、檢查自動化機組的自動補給裝置
6. Check the automatic supply device of the automatic unit
試驗方法:在控制電路電路完全聯結完畢后,將工作方式選擇開關搬向自動人為放水放油至低液位,應能自動補給, 當液面上升到高液位時補給應能自動停止。
Test method: after the control circuit is fully connected, move the working mode selection switch to automatic manual water and oil drainage to the low level, which shall be able to automatically replenish. When the liquid level rises to the high level, the replenishment shall be able to automatically stop.
試驗三次,只要有一次不合格,復試次數加倍,若仍有一次不合格,則認為此項不合格。
If one of the three tests is unqualified, the number of retests shall be doubled. If there is still one unqualified, it is considered to be unqualified.
此外也要檢查自動化機組的保護性、檢查自動化機組的冷卻水、機油加熱等事項,更多檢查項目合格才能進行下一步 使用,詳情就來我們網站http://pyucoin.com聯系了解吧。
In addition, it is also necessary to check the protection of the automatic unit, check the cooling water and oil heating of the automatic unit. More inspection items can be used in the next step only if they are qualified. Please visit our website for details http://www.huannengpower. Contact me to understand.
新聞搜索
濟南濟柴環能燃氣發電設備有限公司
  • 服務熱線

    0531-62325028
    0531-69951266

放置了半年的焦化發電機組需要做哪些檢測

放置了半年的焦化發電機組需要做哪些檢測呢?實際上不算很難,一般的要做以下幾點檢查:
What tests should be done for the coking generator set that has been placed for half a year? In fact, it is not very difficult. Generally, the following checks are required:
1、檢查機組的啟動成功率
1. Check the startup success rate of the unit
試驗方法:試驗應在符合產品技術條件規定的準備啟動狀態下,每給一個啟動指令,啟動成功后突加功率為1.0的50% 的額定負載運行5min,再停機。試驗100次。啟動成功率應大于99%。否則,則認為此項不合格。
Test method: the test shall be carried out in the ready to start state in accordance with the technical conditions of the product. After each start command is given, the test shall be conducted with 50% of the rated load of 1.0 for 5min and then shut down. 100 tests. The startup success rate shall be greater than 99%. Otherwise, it is considered as unqualified.
2、檢查機組平均故障間隔期
2. Check the mean time between failures of the unit
檢查方法:機組帶cosФ=0.8的額定負載,連續或累計運行1000h以上,焦化機、發電機均不應出現故障,控制電路的 元件不應出現二次以上故障,否則,則認為此項不合格。此項指標允許在實際運行中進行考核。
Inspection method: unit with cos Ф= 0.8 rated load, continuous or cumulative operation for more than 1000h, the coking machine and generator shall not have fault, and the elements of the control circuit shall not have more than two faults, otherwise, this item is considered unqualified. This indicator can be evaluated in actual operation.
3、檢查機組帶可控硅負載的運行情況
3. Check the operation of the unit with thyristor load
試驗方法:機組帶cosФ≥0.5的三相可控硅整流器負載,在機組額定容量的10%~50%范圍內任一點上均應能穩定工作 。如果產生低頻振蕩,應實行調整,使之能穩定工作,否則認為此項不合格。
Test method: unit with cos Ф The load of three-phase thyristor rectifier ≥ 0.5 shall be able to work stably at any point within the range of 10% ~ 50% of the rated capacity of the unit. If low-frequency oscillation occurs, it shall be adjusted to make it work stably. Otherwise, it is considered unqualified.
焦化發電機組
4、檢查自動化機組的聯動試
4. Check the linkage test of the automatic unit
檢查方法:兩臺機組應互為主備用,任選一臺作主用,人為切斷市電,主用機組自動啟動成功后供電。制造一個故障 ,使主用機組自動停機備用機組則應自動成功后供電。使市電恢復后,備用機組應級自動停機。如不合格,找出原因,排 除故障。兩臺機組分別為主用,復試三次,如仍有一次不合格,則認為此項不合格。
Inspection method: two units shall be used as main and standby for each other, and one unit shall be selected as the main one. The mains power shall be cut off manually, and the power supply shall be supplied after the main unit is automatically started successfully. If a fault is caused, the main unit will automatically shut down, and the standby unit will automatically supply power after success. After the mains power is restored, the standby unit shall stop automatically. If unqualified, find out the reason and eliminate the fault. The two units are mainly used and retested for three times. If one is still unqualified, it is considered as unqualified.
5、檢查自動化焦化發電機組自動啟動功能
5. Check the automatic startup function of the automatic coking generator set
試驗方法:接通啟動電源,將機組工作方式選擇開關搬向自動,送入啟動指令,并且人為使機組啟動不成功,機組應 自動啟動三次。
Test method: connect the startup power supply, move the unit working mode selection switch to automatic, and send the startup command. If the unit fails to be started manually, the unit shall be started automatically for three times.
試驗三次,只要有一次不合格,復試次數加倍,若仍有一次不合格,則認為此項不合格。
If one of the three tests is unqualified, the number of retests shall be doubled. If there is still one unqualified, it is considered to be unqualified.
6、檢查自動化機組的自動補給裝置
6. Check the automatic supply device of the automatic unit
試驗方法:在控制電路電路完全聯結完畢后,將工作方式選擇開關搬向自動人為放水放油至低液位,應能自動補給, 當液面上升到高液位時補給應能自動停止。
Test method: after the control circuit is fully connected, move the working mode selection switch to automatic manual water and oil drainage to the low level, which shall be able to automatically replenish. When the liquid level rises to the high level, the replenishment shall be able to automatically stop.
試驗三次,只要有一次不合格,復試次數加倍,若仍有一次不合格,則認為此項不合格。
If one of the three tests is unqualified, the number of retests shall be doubled. If there is still one unqualified, it is considered to be unqualified.
此外也要檢查自動化機組的保護性、檢查自動化機組的冷卻水、機油加熱等事項,更多檢查項目合格才能進行下一步 使用,詳情就來我們網站http://pyucoin.com聯系了解吧。
In addition, it is also necessary to check the protection of the automatic unit, check the cooling water and oil heating of the automatic unit. More inspection items can be used in the next step only if they are qualified. Please visit our website for details http://www.huannengpower. Contact me to understand.
在线无码视频| 日韩专区中文字幕| 午夜视频在线观看免费| 懂色av一区二区三区| 乱伦我不卡| 欧美一级在线| 俺去久久啦国产| 无码视频在线看| 成人免费在线观看网站| 国产免费一区二区三区| 国产婷婷精品| 中文字幕一区二区三区四区| 色欲AV人妻精品一区二区三区| 国产精品无码午夜福利免费看| 一区二区无码高清| 日韩欧美在线视频| 日本www高清视频| 在线观看亚洲视频| 欧美日韩俄乌国产男女操逼逼视频 | 青青草偷拍视频| 国产三级自拍| 精品福利| 亚洲天堂黄色| 久久国产精品无码一级毛片| 国产成人无码不卡精品久久久| 国产欧美日韩精品专区黑人| 一级淫片120分钟试看| 国产精品视频| 欧美精品剧情美女被操| 国产又黄又爽| 亚洲国产网站| 在线观看中文字幕| 欧美精品在欧美一区二区少妇| 正面偷拍女厕36个美女嘘嘘| 制服丝袜综合| 中文字幕在线免费看| 青娱乐一级| 美国一级草草草视频| 国产精品久久久久久亚洲调教| 人妻精品一区| 国产不卡视频一区二区三区|