日韩不卡视频在线观看一区_亚洲国产精品久久久久久6p_区三区日韩免费毛片_亚洲精品久久一区二区三区四区_精品国产电影久久官网_婷婷五月天视频_久久久国产成人片_婬乱久久久久_伊人久久大香线蕉av蜜芽_不卡在线中文字幕av

歡迎進入濟南濟柴環能燃氣發電設備有限公司官網!

常見問題解答

燃氣發電機組尾氣余熱利用效果

返回 2023.07.24 來源:http://pyucoin.com 0
目前燃料的能量只有約35%被燃氣發電機組轉化為電能,約有30%隨廢氣排出,25%被燃氣發電機組冷卻水帶走,通過機身散發等其它損失約占10%左右,廢氣和換熱器損失的功率比有用功還多。
At present, only about 35% of the fuel energy is converted into electric energy by the Gas-fired power plant unit, about 30% is discharged with exhaust gas, 25% is taken away by the cooling water of the Gas-fired power plant unit, and other losses such as emission through the fuselage account for about 10%. Waste gas and heat exchanger lose more power than useful work.
在我國,目前占燃氣發電機組燃料近55%熱值的廢氣和冷卻水余熱資源基本上被白白浪費掉,燃氣發電機組余熱利用技術的就是來實現將原本白白浪費掉的熱資源充分利用的系統。
In China, waste gas and cooling water waste heat resources, which currently account for nearly 55% of the calorific value of Gas-fired power plant unit fuel, are basically wasted. The waste heat utilization technology of Gas-fired power plant unit is to realize the system of making full use of the waste heat resources.
隨著人民生活質量的提高,制冷和采暖越來越普及,能源消耗越來越大,同時燃氣發電機組余熱資源目前沒有得到綜合利用,消耗了大量能源。根據燃氣發電機組余熱利用現狀,我公司發揮技術優勢,研制開發了一套燃氣機組煙氣余熱利用配套熱管式余熱鍋爐及熱管換熱器,產生的過熱蒸汽和熱水用于余熱發電及企業內部冷熱電聯供。
With the improvement of people's living quality, refrigeration and heating are becoming more and more popular, and energy consumption is increasing. At the same time, the waste heat resources of Gas-fired power plant units are not comprehensively utilized at present, which consumes a lot of energy. According to the current situation of waste heat utilization of Gas-fired power plant units, our company has developed a set of heat pipe type waste heat boiler and heat pipe heat exchanger for waste heat utilization of flue gas of gas-fired power units by giving full play to its technical advantages, and the Superheated steam and hot water generated are used for waste heat power generation and internal combined cooling, heating and power supply of enterprises.
燃氣發電機組
在燃氣機組發電的同時,以機組廢氣的熱量為能源,煙氣通過熱管余熱鍋爐及熱管換熱器,加熱介質水,熱管余熱鍋爐產生的過熱蒸汽用于余熱發電,熱管換熱器產生的熱水通過溴化鋰冷水機組制冷或制熱,系統原理如下圖所示:
At the same time of power generation of gas turbine unit, the heat of unit exhaust gas is taken as the energy source. Flue gas passes through heat pipe waste heat boiler and heat pipe heat exchanger, heating medium water, Superheated steam generated by heat pipe waste heat boiler is used for waste heat power generation, and hot water generated by heat pipe heat exchanger is cooled or heated by Lithium bromide water chiller. The system principle is shown in the following figure:
余熱制冷供暖系統流程圖
Flow diagram of waste heat refrigeration and heating system
綜合利用燃氣發電機組熱能主要從三個方面著手:即電力供應采暖洗浴等供熱以及夏季空調制冷。在綜合利用的設計過程中應充分考慮以下幾方面的因素:
Comprehensive utilization of heat energy of Gas-fired power plant units mainly starts from three aspects: power supply, heating and bathing, and air conditioning and refrigeration in summer. In the design process of comprehensive utilization, the following factors should be fully considered:
利用應避免對燃氣發電機組的性能產生大的影響,即不影響燃氣發電機組的正常運行及功率輸出;
The utilization shall avoid great influence on the performance of Gas-fired power plant unit, that is, it shall not affect the normal operation and power output of Gas-fired power plant unit;
排氣總管到余熱利用系統之間的距離應盡可能短,同時應充分考慮排氣管的隔熱保溫,減少從燃氣發電機組排氣出口至熱管余熱鍋爐的熱量損失;
The distance between the exhaust header and the waste heat utilization system shall be as short as possible, and the heat insulation of the exhaust pipe shall be fully considered to reduce the heat loss from the exhaust outlet of the Gas-fired power plant unit to the heat pipe waste heat boiler;
需要考慮燃氣發電機組負荷變化時給余熱發電及余熱制冷制熱造成的影響,避免因負荷變化使制冷(或制熱)過量或能力不足;
It is necessary to consider the impact on waste heat power generation and waste heat refrigeration and heating caused by load change of Gas-fired power plant unit to avoid excessive refrigeration (or heating) or insufficient capacity due to load change;
考慮到整個流程控制范圍大項點多操作難度大等因素,整個系統應盡可能實行電氣自動化控制和監測;
Considering the large control range, multiple items, and high operational difficulty of the entire process, the entire system should implement electrical automation control and monitoring as much as possible;
整套系統應充分考慮維護操作以及使用的安全性。
The entire system should fully consider the safety of maintenance operations and use.
新聞搜索
濟南濟柴環能燃氣發電設備有限公司
  • 服務熱線

    0531-62325028
    0531-69951266

燃氣發電機組尾氣余熱利用效果

目前燃料的能量只有約35%被燃氣發電機組轉化為電能,約有30%隨廢氣排出,25%被燃氣發電機組冷卻水帶走,通過機身散發等其它損失約占10%左右,廢氣和換熱器損失的功率比有用功還多。
At present, only about 35% of the fuel energy is converted into electric energy by the Gas-fired power plant unit, about 30% is discharged with exhaust gas, 25% is taken away by the cooling water of the Gas-fired power plant unit, and other losses such as emission through the fuselage account for about 10%. Waste gas and heat exchanger lose more power than useful work.
在我國,目前占燃氣發電機組燃料近55%熱值的廢氣和冷卻水余熱資源基本上被白白浪費掉,燃氣發電機組余熱利用技術的就是來實現將原本白白浪費掉的熱資源充分利用的系統。
In China, waste gas and cooling water waste heat resources, which currently account for nearly 55% of the calorific value of Gas-fired power plant unit fuel, are basically wasted. The waste heat utilization technology of Gas-fired power plant unit is to realize the system of making full use of the waste heat resources.
隨著人民生活質量的提高,制冷和采暖越來越普及,能源消耗越來越大,同時燃氣發電機組余熱資源目前沒有得到綜合利用,消耗了大量能源。根據燃氣發電機組余熱利用現狀,我公司發揮技術優勢,研制開發了一套燃氣機組煙氣余熱利用配套熱管式余熱鍋爐及熱管換熱器,產生的過熱蒸汽和熱水用于余熱發電及企業內部冷熱電聯供。
With the improvement of people's living quality, refrigeration and heating are becoming more and more popular, and energy consumption is increasing. At the same time, the waste heat resources of Gas-fired power plant units are not comprehensively utilized at present, which consumes a lot of energy. According to the current situation of waste heat utilization of Gas-fired power plant units, our company has developed a set of heat pipe type waste heat boiler and heat pipe heat exchanger for waste heat utilization of flue gas of gas-fired power units by giving full play to its technical advantages, and the Superheated steam and hot water generated are used for waste heat power generation and internal combined cooling, heating and power supply of enterprises.
燃氣發電機組
在燃氣機組發電的同時,以機組廢氣的熱量為能源,煙氣通過熱管余熱鍋爐及熱管換熱器,加熱介質水,熱管余熱鍋爐產生的過熱蒸汽用于余熱發電,熱管換熱器產生的熱水通過溴化鋰冷水機組制冷或制熱,系統原理如下圖所示:
At the same time of power generation of gas turbine unit, the heat of unit exhaust gas is taken as the energy source. Flue gas passes through heat pipe waste heat boiler and heat pipe heat exchanger, heating medium water, Superheated steam generated by heat pipe waste heat boiler is used for waste heat power generation, and hot water generated by heat pipe heat exchanger is cooled or heated by Lithium bromide water chiller. The system principle is shown in the following figure:
余熱制冷供暖系統流程圖
Flow diagram of waste heat refrigeration and heating system
綜合利用燃氣發電機組熱能主要從三個方面著手:即電力供應采暖洗浴等供熱以及夏季空調制冷。在綜合利用的設計過程中應充分考慮以下幾方面的因素:
Comprehensive utilization of heat energy of Gas-fired power plant units mainly starts from three aspects: power supply, heating and bathing, and air conditioning and refrigeration in summer. In the design process of comprehensive utilization, the following factors should be fully considered:
利用應避免對燃氣發電機組的性能產生大的影響,即不影響燃氣發電機組的正常運行及功率輸出;
The utilization shall avoid great influence on the performance of Gas-fired power plant unit, that is, it shall not affect the normal operation and power output of Gas-fired power plant unit;
排氣總管到余熱利用系統之間的距離應盡可能短,同時應充分考慮排氣管的隔熱保溫,減少從燃氣發電機組排氣出口至熱管余熱鍋爐的熱量損失;
The distance between the exhaust header and the waste heat utilization system shall be as short as possible, and the heat insulation of the exhaust pipe shall be fully considered to reduce the heat loss from the exhaust outlet of the Gas-fired power plant unit to the heat pipe waste heat boiler;
需要考慮燃氣發電機組負荷變化時給余熱發電及余熱制冷制熱造成的影響,避免因負荷變化使制冷(或制熱)過量或能力不足;
It is necessary to consider the impact on waste heat power generation and waste heat refrigeration and heating caused by load change of Gas-fired power plant unit to avoid excessive refrigeration (or heating) or insufficient capacity due to load change;
考慮到整個流程控制范圍大項點多操作難度大等因素,整個系統應盡可能實行電氣自動化控制和監測;
Considering the large control range, multiple items, and high operational difficulty of the entire process, the entire system should implement electrical automation control and monitoring as much as possible;
整套系統應充分考慮維護操作以及使用的安全性。
The entire system should fully consider the safety of maintenance operations and use.
国产伊人久久| 中文无码不卡| 操人人视频| 亚洲国产精品无码一线岛国| 永久免费国产| 秋霞无码| 一级av免费在线观看| 91精品国啪老师啪| 色综合天天| 91日韩| 丁香五月天色| 无码专区AV| 黄色av网站在线观看| BAOYU| 日韩精品久久久| 色视频成人在线观看免| 亚洲无码字幕| 五月婷婷六月丁香| 热久久久久久久| 综合久久久| 国产a区| 秋霞成人无码免费A片果冻| 亚洲九九无码精品| 亚洲精品一区二三区不卡| 99在线观看| 99视频在线| 欧美成人无码A片免费一区澳门| av电影一区二区三区| 免费看一级高潮毛片| 日韩免费在线| 无码人妻中文50p| 久久五月综合| 99精品欧美一区二区三区黑人| 日韩无码人妻| 玖玖精品| 亚洲AV高清无码| 国产av久| 视频在线观看蜜乳| aaaa黄色激情| 国产家庭乱伦视屏| 一性一交一伦一色一区二免费看|