煤礦瓦斯發電機組技術維護要注意哪些?

返回 2020.03.20 來源:http://pyucoin.com 0
  煤礦瓦斯發電機組技術維護
  Technical maintenance of coal mine gas generator set無論高濃度和低濃度瓦斯發電機組,由于天然氣的特殊性必須注意檢測和維護的發電機組,發電機組的維護應該靈活控制啟動的累積時間。
  Regardless of the high concentration and low concentration gas generator set, due to the particularity of natural gas, attention must be paid to the detection and maintenance of the generator set. The maintenance of the generator set should be flexible to control the cumulative start-up time.
  煤礦瓦斯發電機組A級維護檢查
  Class a maintenance and inspection of coal mine gas generator set1.檢查發電機組的日常工作報告,并根據日常工作報告安排維護和必要的調整。
瓦斯發電機組
  1. Check the daily work report of the generator unit, and arrange maintenance and necessary adjustment according to the daily work report.
  2.檢查發電機組平面和冷卻液平面,主要區分油標尺的高標志和位置標志。冷卻后必須對冷卻平面進行檢查。
  2. Check the generator unit plane and coolant plane, mainly distinguish the high mark and position mark of oil scale. The cooling plane must be checked after cooling.
  3.檢查發電機組是否損壞,皮帶是否松動或磨損。如皮帶松動或打滑,應及時調整或更換。
  3. Check whether the generator set is damaged and whether the belt is loose or worn. If the belt is loose or slipping, it shall be adjusted or replaced in time.
  4.檢查機組正常啟動后,油壓是否正常,功率是否充足,冷卻水、油溫是否正常,燃油、冷卻液、潤滑油是否泄漏。
  4. Check whether the oil pressure is normal, whether the power is sufficient, whether the cooling water and oil temperature are normal, and whether the fuel oil, coolant and lubricating oil leak after the unit is started normally.
  二、煤礦瓦斯發電機組B級維護檢查
  2、 Class B maintenance and inspection of coal mine gas generator set下列維護操作是在A級維護檢查的基礎上進行的。
  The following maintenance operations are carried out on the basis of A-level maintenance inspection.
  1. 更換發電機組機油,更換時間為250小時或1個月。換油標準不得超過油表上的高標記。
  1. Change the engine oil of generator set for 250 hours or 1 month. The oil change standard shall not exceed the high mark on the oil gauge.
  2. 更換發電機組的機油濾清器。在安裝新的機油濾清器之前,更好在密封件上涂一層機油。不要過緊機油濾清器,否則會導致漏油。
  2. Replace the oil filter of the generator set. Before installing a new oil filter, it is best to apply a coat of oil to the seal. Do not over tighten the oil filter, otherwise it will cause oil leakage.
  3.更換油濾器濾芯。更換濾芯時,必須將發電機組內的空氣排出。
  3. Replace the oil filter element. When replacing the filter element, the air in the generator set must be discharged.
  4. 清潔或更換發電機組的空氣濾清器。
  4. Clean or replace the air filter of the generator set.
  以上是瓦斯發電機組廠家為大家介紹的相關內容,想要了解更多內容,歡迎訪問網站:http://pyucoin.comThe above is the related content introduced by the manufacturer of gas generator set. For more information, please visit the website: http://pyucoin.com
新聞搜索
濟南濟柴環能燃氣發電設備有限公司
  • 服務熱線

    0531-62325028
    0531-69951266

煤礦瓦斯發電機組技術維護要注意哪些?

  煤礦瓦斯發電機組技術維護
  Technical maintenance of coal mine gas generator set無論高濃度和低濃度瓦斯發電機組,由于天然氣的特殊性必須注意檢測和維護的發電機組,發電機組的維護應該靈活控制啟動的累積時間。
  Regardless of the high concentration and low concentration gas generator set, due to the particularity of natural gas, attention must be paid to the detection and maintenance of the generator set. The maintenance of the generator set should be flexible to control the cumulative start-up time.
  煤礦瓦斯發電機組A級維護檢查
  Class a maintenance and inspection of coal mine gas generator set1.檢查發電機組的日常工作報告,并根據日常工作報告安排維護和必要的調整。
瓦斯發電機組
  1. Check the daily work report of the generator unit, and arrange maintenance and necessary adjustment according to the daily work report.
  2.檢查發電機組平面和冷卻液平面,主要區分油標尺的高標志和位置標志。冷卻后必須對冷卻平面進行檢查。
  2. Check the generator unit plane and coolant plane, mainly distinguish the high mark and position mark of oil scale. The cooling plane must be checked after cooling.
  3.檢查發電機組是否損壞,皮帶是否松動或磨損。如皮帶松動或打滑,應及時調整或更換。
  3. Check whether the generator set is damaged and whether the belt is loose or worn. If the belt is loose or slipping, it shall be adjusted or replaced in time.
  4.檢查機組正常啟動后,油壓是否正常,功率是否充足,冷卻水、油溫是否正常,燃油、冷卻液、潤滑油是否泄漏。
  4. Check whether the oil pressure is normal, whether the power is sufficient, whether the cooling water and oil temperature are normal, and whether the fuel oil, coolant and lubricating oil leak after the unit is started normally.
  二、煤礦瓦斯發電機組B級維護檢查
  2、 Class B maintenance and inspection of coal mine gas generator set下列維護操作是在A級維護檢查的基礎上進行的。
  The following maintenance operations are carried out on the basis of A-level maintenance inspection.
  1. 更換發電機組機油,更換時間為250小時或1個月。換油標準不得超過油表上的高標記。
  1. Change the engine oil of generator set for 250 hours or 1 month. The oil change standard shall not exceed the high mark on the oil gauge.
  2. 更換發電機組的機油濾清器。在安裝新的機油濾清器之前,更好在密封件上涂一層機油。不要過緊機油濾清器,否則會導致漏油。
  2. Replace the oil filter of the generator set. Before installing a new oil filter, it is best to apply a coat of oil to the seal. Do not over tighten the oil filter, otherwise it will cause oil leakage.
  3.更換油濾器濾芯。更換濾芯時,必須將發電機組內的空氣排出。
  3. Replace the oil filter element. When replacing the filter element, the air in the generator set must be discharged.
  4. 清潔或更換發電機組的空氣濾清器。
  4. Clean or replace the air filter of the generator set.
  以上是瓦斯發電機組廠家為大家介紹的相關內容,想要了解更多內容,歡迎訪問網站:http://pyucoin.comThe above is the related content introduced by the manufacturer of gas generator set. For more information, please visit the website: http://pyucoin.com
JDAV视频在线观看免费| 亚洲视频在线免费观看| 夜夜高潮夜夜爽精品欧美做爰| 欧美日韩精品| 91在线无码高潮喷水观看99久| 在线播放成人A片麻豆网站| 久久国产视频网站| 国产精品久久久久无码AV蜜臀| 国产精品久久久久久电影| 人人爽人人操人人操人人操人人操| 无码专区AV| av大片在线观看| 国产视频一区在线| 欧美亚洲中文字幕| 亚州中文字幕一区二区三区在线视频| 日韩乱码一区二区| 日本熟妇视频| 探花一区二三区四无码| 欧美精品国产| 小小拗女一区二区三区| AAAAAAA黄色视频| 美国a片| 天天干天天弄| www.久久精品| c逼网站| 精品久久久久久| 亚洲一区二区人妻| 精品网站999www| 操逼国产A| 久久这里有精品| 久久人妻一区二区三区| 久久久久久精品一级毛片蜜| 亚洲欧美日韩国产| 国产白嫩漂亮KTV在| 亚洲精品日韩激情在线电影| 奇米精品一区二区三区在线观看| 免费操逼| 人妻夜夜爽天天爽三区麻豆AV网站| 亚洲中文字幕无码视频| 国精精品一区二区三区有限公司| 国产精品高清网站|